Issue 11376: Section: 8.3.2 Figure 8.14 (updm-ftf) Source: International Business Machines (Mr. Fred Mervine, fred(at)mervine.us) Nature: Revision Severity: Significant Summary: Fig 8.14 diagram shows AllView - all the names should be AllViews Resolution: Revised Text: Actions taken: September 13, 2007: received issue Discussion: End of Annotations:===== me: Fred Mervine Company: IBM mailFrom: fmervine@us.ibm.com Notification: Yes Specification: UML Profile for the Department of Defense Architecture Framework and the Ministry of Defence Architecture Framework Section: 8.3.2 Figure 8.14 FormalNumber: dtc/2007-08-02 Version: Beta 1 RevisionDate: 08/02/07 Page: 36 Nature: Revision Severity: Significant HTTP User Agent: Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.8.1.6) Gecko/20070725 Firefox/2.0.0.6 Description Fig 8.14 diagram shows AllView . all the names should be AllViews To: updm-ftf@omg.org Subject: editor's note on 11376 X-Mailer: Lotus Notes Release 7.0 HF277 June 21, 2006 From: Peter Bahrs Date: Mon, 18 Feb 2008 22:42:13 -0600 X-MIMETrack: Serialize by Router on D03NM120/03/M/IBM(Release 7.0.2FP2HF300 | September 14, 2007) at 02/18/2008 21:42:14, Serialize complete at 02/18/2008 21:42:14 Issue 11376 passed in ballot1. It indicated updates to A.1.2.5 with - "Figure A.1.1.5 shows the elements in the AV-1 related to all of the products and elements throughout the model. " and updates to A.1.2.5 with - "Figure A.1.2.5 shows the elements in the AV-2 related to all of the products and elements throughout the model" During the current merge and reformatting of the document, I found the text "Figure A 1.1.5" should be "Table A.1" and Figure A.1.2.5 should be "Table B." (in both cases, the previous Table was incorrectly called a Figure). I recommend making these editorial changes and updating the ballot document with this text instead of asking for another vote. Objections? Silence is confirmation. -Peter Ron C Williamson 02/18/2008 08:35 PM To updm-ftf@omg.org cc Subject UPDM FTF: Stereotype mapping table update... All, Have updated to Rev B from the previous version based on feedback from Fred and Sandy and another re-check myself. See attached. If you find any more errors or need for updates based on the latest batch of ballot results or other issues...let me know and I'll update the spreadsheet as we go. I'm focusing on L1 section 10, but this format may be a useful summary of the spec as a whole and helps highlight any additional issues. Cheers, Ron Ron C Williamson, Ph.D. Engineering Fellow NCS California Engineering FU / 675 / Y343 714.446.4932 (office) 714.331.9354 (cell) 714.446.3230 fax ron_c_williamson@raytheon.com Raytheon Certified Architect TOGAFTM Certified [attachment "Final Spec Element List Rev B.xls" deleted by Peter Bahrs/Austin/IBM]