Issue 14339: Page 265, Activity Boundary Connections (bpmn2-ftf) Source: Trisotech (Mr. Denis Gagne, dgagne(at)trisotech.com) Nature: Uncategorized Issue Severity: Summary: Reported by dga...@trisotech.com, Jul 29, 2009 In the structural specifications under "Activity Boundary Connections" the list of Intermediate Events that can be attached is provided (second structural spec.). In the structural specifications under "Sequence Flow Connections" the same list is provided (first sttructural spec.). Is it required to duplicate the list? The content of the list is different, Escalation is not included in the second list. Resolution: Remove redundant text from the Sequence Flow considerations of an Intermediate Event. (a) Section 10.4.4, Sub-Section "Sequence Flow Connections," page 237 (267 pdf): Remove first bullet in section (b) Section 10.4.4, Sub-Section "Sequence Flow Connections," page 237 (267 pdf): Change indent level to the left for the next bullet (after removing the first bullet Revised Text: Actions taken: September 4, 2009: received issue October 21, 2010: closed issue Discussion: End of Annotations:===== iler: QUALCOMM Windows Eudora Version 7.1.0.9 Date: Fri, 04 Sep 2009 15:10:06 -0400 To: bpmn2-ftf@omg.org From: Juergen Boldt Subject: OMG Issue Created 14339 This is issue # 14339 Issue 153: Page 265, Activity Boundary Connections Reported by dga...@trisotech.com, Jul 29, 2009 In the structural specifications under "Activity Boundary Connections" the list of Intermediate Events that can be attached is provided (second structural spec.). In the structural specifications under "Sequence Flow Connections" the same list is provided (first sttructural spec.). Is it required to duplicate the list? The content of the list is different, Escalation is not included in the second list. Juergen Boldt Director, Member Services Object Management Group 140 Kendrick St Building A Suite 300 Needham, MA 02494 USA tel: +1 781 444 0404 x 132 fax: +1 781 444 0320 email: juergen@omg.org www.omg.org