Issue 15588: Page 190. Paragraph needs to be nested (bpmn2-rtf) Source: (, ) Nature: Revision Severity: Minor Summary: Paragraph: “If the details of the called Process are available, then the shape of the Call Activity will be the same as a expanded Sub-Process, but the boundary of the shape MUST have a thick line (see Figure 10.41).” This paragraph should be a sub-bullet of “If the Call Activity calls a Process, then there are two (2) options:”, because it describes the second option. Resolution: Revised Text: Actions taken: September 18, 2010: received issue Discussion: End of Annotations:===== m: webmaster@omg.org Date: 18 Sep 2010 00:45:18 -0400 To: Subject: Issue/Bug Report ******************************************************************************* Name: Eduardo Jara Employer: mailFrom: ejara@craftware.net Terms_Agreement: I agree Specification: BPMN 2.0 Beta 2 Section: 10.2.6 FormalNumber: dtc/2010-06-05 Version: 2.0 Doc_Year: 2010 Doc_Month: June Doc_Day: Day Page: 190 Title: Page 190. Paragraph needs to be nested. Nature: Revision Severity: Minor CODE: 3TMw8 B1: Report Issue Description: Paragraph: .If the details of the called Process are available, then the shape of the Call Activity will be the same as a expanded Sub-Process, but the boundary of the shape MUST have a thick line (see Figure 10.41).. This paragraph should be a sub-bullet of .If the Call Activity calls a Process, then there are two (2) options:., because it describes the second option.