Issue 17556: 10pm to 2am does not specified a time period (date-time-ftf) Source: International Business Machines (Mr. Mark H. Linehan, mlinehan(at)us.ibm.com) Nature: Uncategorized Issue Severity: Summary: In clause 8.6 of the beta-2 specification, the verb concepts ‘time point1 through time point2 specifies time interval’ and ‘time point1 to time point2 specifies time interval’ do not work for the example ‘10pm to 2am’. Reason: the Definitions of these verb concepts form a time point sequence over the time between the two time points, but for this example, the time point sequence “wraps around’ the end of the day of hours scale. And no time point sequence can do that. Resolution: Revised Text: Actions taken: August 20, 2012: received issue Discussion: End of Annotations:===== MG Issue No: 17556 Title: 10pm to 2am does not specified a time period Source: Mark H. Linehan, IBM Research, mlinehan@us.ibm.com Summary: In clause 8.6 of the beta-2 specification, the verb concepts .time point1 through time point2 specifies time interval. and .time point1 to time point2 specifies time interval. do not work for the example .10pm to 2am.. Reason: the Definitions of these verb concepts form a time point sequence over the time between the two time points, but for this example, the time point sequence .wraps around. the end of the day of hours scale. And no time point sequence can do that. Resolution: Revised Text: Disposition: ??? To: date-time-ftf@omg.org Subject: Date-Time Issue 17556 - 10pm to 2am does not specified a time period X-KeepSent: 517C4634:CE51B572-85257A6D:0067BAB9; type=4; name=$KeepSent X-Mailer: Lotus Notes Release 8.5.3 September 15, 2011 From: Mark H Linehan Date: Sun, 2 Sep 2012 20:01:26 -0400 X-MIMETrack: Serialize by Router on D01MC604/01/M/IBM(Release 8.5.3FP2IF1|July 25, 2012) at 09/02/2012 20:01:26 X-Content-Scanned: Fidelis XPS MAILER x-cbid: 12090300-5930-0000-0000-00000B88D1CD Proposed resolution: Ed, this needs a new version of figure 8.19. -------------------------------- Mark H. Linehan STSM, IBM Research Date-Time Issue 17556 - 10pm to 2am does not specify a time period1.doc sposition: Resolved OMG Issue No: 17556 Title: 10pm to 2am does not specified a time period Source: Mark H. Linehan, IBM Research, mlinehan@us.ibm.com Summary: In clause 8.6 of the beta-2 specification, the verb concepts .time point1 through time point2 specifies time interval. and .time point1 to time point2 specifies time interval. do not work for the example .10pm to 2am.. Reason: the Definitions of these verb concepts form a time point sequence over the time between the two time points, but for this example, the time point sequence .wraps around. the end of the day of hours scale. And no time point sequence can do that. Resolution: Delete the two verb concepts .time point1 through time point2 specifies time interval. and .time point1 to time point2 specifies time interval.. Add a new Synonymous Form .time interval1 through time interval2 specifies time interval3. to the existing clause 8.1.5 verb concept .time interval1 plus time interval2 is time interval3.. Do not replace .time point1 to time point2 specifies time interval. since the concept is already addressed by the existing clause 8.1.5 verb concept .time interval1 to time interval2 specifies time interval3.. Revised Text: This revised text applies to the beta-2 specification. In clause 8.1.5 add a Synonymous Form after the existing Synonymous Forms in the glossary entry for .time interval1 plus time interval2 is time interval3.: Synonymous Form: time interval1 through time interval2 specifies time interval3 In clause 8.6, replace figure 8.19, to deletes these two verb concepts. <> In clause 8.6, delete the glossary entries for .time point1 through time point2 specifies time interval. and .time point1 to time point2 specifies time interval.. Disposition: Resolved