Issue 18037: Not clear when to use ExecutionOccurrenceSpecification with ExecutionSpecification (uml25-ftf) Source: Oracle (Darren Kumasawa, darren.kumasawa(at)oracle.com) Nature: Revision Severity: Significant Summary: Location: Page #607, 17.2.3 Semantics, Execution Specifications Page #619, 17.5.3 Semantics, Execution Occurrence Specifications Title: Not clear when to use ExecutionOccurrenceSpecification with ExecutionSpecification Summary: Page #607, 17.2.3 Semantics, Execution Specifications "Typically the start occurrence and the finish occurrence will represent OccurrenceSpecifications such as a receive OccurrenceSpecification (of a Message) and the send OccurrenceSpecification (of a reply Message)." Page #619, 17.5.3 Semantics, Execution Occurrence Specifications "A ExecutionOccurrenceSpecification represents, on a lifeline, the start event or the end event of an ExecutionSpecification." When should ExecutionOccurrenceSpecifications be used as start and finish of ExecutionSpecification, and when should Message/Destruction OccurrenceSpecifications be used instead? The ExecutionOccurrenceSpecification is the only one that has a reference back to ExecutionSpecification. Is there a guideline of when to use one over the other? Resolution: Revised Text: Actions taken: September 27, 2012: received issue Discussion: End of Annotations:===== s is issue # 18037 Problem: 17.021 Severity: Significant Nature: Revision Location: Page #607, 17.2.3 Semantics, Execution Specifications Page #619, 17.5.3 Semantics, Execution Occurrence Specifications Title: Not clear when to use ExecutionOccurrenceSpecification with ExecutionSpecification Summary: Page #607, 17.2.3 Semantics, Execution Specifications "Typically the start occurrence and the finish occurrence will represent OccurrenceSpecifications such as a receive OccurrenceSpecification (of a Message) and the send OccurrenceSpecification (of a reply Message)." Page #619, 17.5.3 Semantics, Execution Occurrence Specifications "A ExecutionOccurrenceSpecification represents, on a lifeline, the start event or the end event of an ExecutionSpecification." When should ExecutionOccurrenceSpecifications be used as start and finish of ExecutionSpecification, and when should Message/Destruction OccurrenceSpecifications be used instead? The ExecutionOccurrenceSpecification is the only one that has a reference back to ExecutionSpecification. Is there a guideline of when to use one over the other? Proposed Resolution: Revised Text: Source: darren.kumasawa@oracle.co