Issue 5043: concept of stimulus of UML metamodels (uml-scheduling-ftf) Source: Universidad Politecnica de Madrid (Prof. Miguel de Miguel, mmiguel(at)dit.upm.es) Nature: Uncategorized Issue Severity: Summary: Most of behavior concepts are based on the stimulus concept that is used in UML metamodels for the description of sequence diagrams semantics, but not for other diagrams like collaboration diagrams. This creates confusion because we can think that we are talking about the concept of stimulus of UML metamodels, and I suppose that this is not the intention of the authors. Resolution: Closed, no change Revised Text: Actions taken: March 20, 2002: received issue June 30, 2003: closed issue Discussion: This is a general problem; all the useful terms are already taken and it is impractical to try to avoid conflicts with some existing UML metamodel terms. An explicit warning was provided early in the document about this and I do not think we need to do more (Bran) End of Annotations:===== This is issue # 5043 concept of stimulus of UML metamodels Most of behavior concepts are based on the stimulus concept that is used in UML metamodels for the description of sequence diagrams semantics, but not for other diagrams like collaboration diagrams. This creates confusion because we can think that we are talking about the concept of stimulus of UML metamodels, and I suppose that this is not the intention of the authors.