Issue 5067: Section 7.1.2 Types of Analysis Methods, Dynamic Scheduling paragraph, page (uml-scheduling-ftf) Source: U.S. Army Cecom-CSE (Mr. Tom Wheeler, ) Nature: Uncategorized Issue Severity: Summary: This paragraph mentions “value based scheduling”. This phrase however, does not appear in following pages where tag – value pairs are defined for scheduling policies. Is the “MaxizeAccruedUtility” policy meant to cover value based scheduling? If so, I recommend the phrase “value based scheduling” be replaced with “utility-based scheduling”. Resolution: Add reference to utility-based scheduling as alternative nomenclature Revised Text: See new sentence for Issue 5064. Actions taken: March 20, 2002: received issue June 30, 2003: closed issue Discussion: Add reference to utility-based scheduling as alternative nomenclature End of Annotations:===== This is issue # 5067 Section 7.1.2 Types of Analysis Methods, Dynamic Scheduling paragraph, page 112 This paragraph recommend the mentions phrase be replaced with