Issue 5069: TimedAction and SAction (uml-scheduling-ftf) Source: Universidad Politecnica de Madrid (Prof. Miguel de Miguel, mmiguel(at)dit.upm.es) Nature: Uncategorized Issue Severity: Summary: 8. TimedAction and SAction are introduced as actions that can include subactions. In that case the priority of an action can be variable (subactions can vary their priority). Because of this, the description of priority in page 115 can create confusion. Resolution: Closed, no change Revised Text: Actions taken: March 20, 2002: received issue June 30, 2003: closed issue Discussion: Clarify End of Annotations:===== this is issue # 5069 TimedAction and SAction 8. TimedAction and SAction are introduced as actions that can include subactions. In that case the priority of an action can be variable (subactions can vary their priority). Because of this, the description of priority in page 115 can create confusion.